The Challenge
What's holding manufacturing businesses back?
Production Planning Gaps
Manual scheduling disconnected from demand signals means either idle capacity or missed delivery commitments.
BOM & Routing Chaos
Bills of materials maintained in spreadsheets, inconsistent across products, and never reflecting actual shop floor reality.
Quality Escapes
No systematic quality checkpoints means defects discovered at the end of the line — or worse, by the customer.
Cost Opacity
True manufacturing cost — material, labour, machine time, overhead — impossible to calculate accurately or quickly.
The Solution
What changes when you run on Odoo
Manufacturing (MRP)
Production orders, work centre scheduling, and MRP runs that generate purchase and manufacturing orders from real demand.
Bills of Materials
Multi-level BOMs with component variants, phantom sub-assemblies, and version control — maintained in one authoritative system.
Quality
Quality control points at any production stage, with non-conformance records, root cause analysis, and corrective action tracking.
Inventory
Lot and serial number tracking, landed cost allocation, and warehouse transfers — with full traceability from supplier to customer.
Purchase
Vendor-managed inventory, blanket orders, and automated replenishment triggered by production demand.
Maintenance
Preventive and corrective maintenance for production equipment — so planned downtime doesn't become unplanned crisis.
Our Edge
Our Manufacturing Expertise
MRP Before Configuration
We map your production flow, routing, and costing model before touching Odoo — so the system reflects your floor, not a generic template.
Lot Traceability Design
For food, pharma, or regulated manufacturing, we configure full upstream and downstream lot traceability — audit-ready from day one.
True Cost Reporting
We build your standard and actual cost model so that every production order produces an accurate cost variance — and margin is always visible.
"We went from three disconnected systems to one. The visibility alone paid for the implementation in the first quarter."
Illustrative outcome — typical client result
Start Here